Eastern Municipal Water District

Project overview Vanir provided construction management services to Eastern Municipal Water District (EMWD) for two large, existing pipeline projects: The San Jacinto Valley (SJV) Water Supply project consists of construction of approximately 2.25 miles of 60-inch feeder along Esplanade, Sanderson and Commonwealth Avenues to the Hemet Water Filtration Plant, which will provide additional water supply […]
Fire Station No. 16 Replacement

Project overview Fire Station No. 16 has been serving its community since 1938. With the help of the 2010 Earthquake Safety and Emergency Response (ESER) Bond, the San Francisco Public Works Department hired Vanir to provide project and construction management services to replace and upgrade the historical structure. Fire Station No. 16’s upgrades included seismic […]
Kern Community College District – Porterville College Allied Health Building

Project overview Vanir provided site development and project and construction management services for a new Allied Health Building in the center of Kern Community College District’s (KCCD) Porterville College. The single-story, 23,000-square-foot building contains 16,270 assignable square feet (ASF) comprised of: 4,781 ASF lecture hall 6,763 ASF laboratory 1,265 ASF office 970 ASF audio visual […]
City of Corcoran – Gateway Park

Project overview Vanir provided construction management services for the City of Corcoran’s new 8-acre Gateway Park. In 2018, California Proposition 68 was passed to authorize $4 billion in general obligation bonds for state and local parks, environmental and restoration projects and water infrastructure and flood protection projects. Gateway Park includes: Pre-fabricated restroom facilities A covered/shaded […]
Central Unified School District – Justin Garza High School

Project overview Vanir served Central Unified School District during the construction of its new 231,734-square-foot Justin Garza High School. Our role involved performing monthly schedule reviews, time impact analysis (TIA) services and commissioning. The campus consists of nine buildings, including three academic classroom buildings, an administration building, a gymnasium, locker room, food service facility and […]
Highline Public Schools – Glacier Middle School

Project overview Vanir served as the program, project and construction manager for Highline Public Schools’ 2016 Capital Bond Program, which included construction of the new 142,000-square-foot Glacier Middle School. The project involved demolishing an existing closed school to construct the new middle school on the same site. Key features include: New utilities A storm retention […]
Tacoma Public Schools – Skyline Elementary School

Project overview Vanir provided project and construction management services for Tacoma Public Schools’ new Skyline Elementary School, one of eight school replacements/historic renovations funded by a $535 million school construction bond passed in 2020. The 45,145-square-foot facility includes two classroom wings that connect to a central learning commons area/cafeteria, as well as a gym with […]
Dallas Independent School District 2015 Bond Program

Project overview Vanir, as part of a joint venture (JV) with Dikita, is providing program management services for Dallas Independent School District’s 2015 Bond Program. The $1.6 billion districtwide program is addressing renovations, additions and new facility needs for educational, administrative and athletic facilities. Our scope of work at each school includes the pre-design, design, […]
Highline Public Schools 2016 Bond Program

Program overview Vanir provided program, project and construction management (PMCM) services for Highline Public Schools’ 2016 $384 million capital bond program. Our services included managing the design for all projects, which resulted in tight bids within the owner’s estimate, substantial bid coverage (notable in a hot economy) and few changes during construction. The program was […]
Valleywise Comprehensive Health Center – Peoria

Project overview The 127,000-square-foot Valleywise Comprehensive Health Center in Peoria was built as part of a seven-year bond to improve and expand Valleywise Health Facilities. As the integrated program manager for the bond program, Vanir was instrumental in the successful delivery of this new outpatient facility. The three-story facility was built on a vacant site […]