California School for the Deaf, Riverside

Project overview Vanir provided project management and construction management services for the California School for the Deaf project in Riverside (CSDR). CSDR helps deaf and hard-of-hearing children develop skills that will enable them to become independent and successful members of their community. Vanir is honored to have played a role in delivering state-of-the-art facilities for […]
Fort Logan Northgate School

Project overview Vanir served as the owner’s representative for the construction of the new Fort Logan Northgate School, a partial two-story structure that is LEED Gold certified. The school combined students from the existing Fort Logan Elementary and Sheridan Middle schools, creating a new grades 3-8 school. This project also included a major renovation of […]
Fremont Unified School District – American High School

Project overview The Vanir team provided program and project management services for two new science buildings at American High School. The new construction was part of the $650 million Measure E Bond Program. Project highlights included: • 10 science laboratory classrooms and eight general classrooms with flexible layouts and accommodation for 583 students Buildings were […]
Admiral Akers Elementary School

Project overview Vanir served as the construction manager for Central Union School District’s new construction, renovation and modernization project at Admiral Akers School, located at the Lemoore Naval Air Station (LNAS). All personnel entering LNAS to work on this project had to pass a background check vetted through the U.S. Department of Defense. The project […]
Del Paso Manor Elementary School

Project overview Vanir provided construction management services for Del Paso Manor Elementary School’s new campus. Completed ahead of schedule, the new campus includes: 30 NexGen classrooms An administration office A multipurpose room A kitchen Four doublewide portables Playgrounds The NexGen classroom model includes a wireless network, moveable furniture, multiple writing walls and large TV screens […]
Rio Americano High School Center for the Arts

Project overview Vanir provided construction management services for the new 350-seat performing arts building at Rio Americano High School. The facility includes: A state-of-the-art control/sound room Two NexGen music classrooms Four practice rooms A ticket booth on the exterior Men’s/women’s restrooms accessible from the lobby Second floor accessible via an ADA elevator This much-needed Center […]
El Camino Fundamental High School Center for the Arts

Project overview Vanir served as the construction manager for the award-winning El Camino Fundamental High School Center for the Arts—not only was it the first progressive design-build project for the District, but it was delivered early and under budget! The state-of-the-art venue has a tiered theater of 500 fixed seats and 100 portable seats in […]
West Park High School Phase I

Project overview Vanir provided construction management services for Phase I of West Park High School, located on a 55-acre site. The Vanir team initially performed constructability review services for the new high school, which led to our additional role on the project. The project consisted of: Two three-story collaborative learning suites Sunken football/soccer/lacrosse all-weather turf […]
Natomas Unified School District – Westlake Charter School

Project overview Vanir provided full-service professional and technical construction management services during the design and preconstruction phases for Westlake Charter School, a new K-8 school consisting of seven buildings. Five of the buildings are classrooms, one is a multipurpose building (with a gym, dining, kitchen and media center) and another is an administration office. For […]
Natomas Unified School District – Paso Verde School

Project overview Vanir provided construction management services for Natomas Unified School District’s new Paso Verde School, an innovative TK-8 school built to support the District’s robust STEAM (science, technology, engineering, arts and mathematics) program. The campus accommodates approximately 1,000 students and includes four classroom buildings, an administration building and a multipurpose gymnasium. Each of the […]