Highland Hospital Acute Tower Replacement Program

Project overview Hailed as the largest construction project ever undertaken by Alameda County, the multiphase Highland Hospital Acute Tower Replacement project was designed to modernize the hospital’s historic campus and bring it into compliance with California’s current seismic safety laws. Vanir provided program and construction management services for the 10-plus-year project, which consisted of three […]
Children’s Hospital at Fitzsimons

Project overview The Vanir team was selected to provide project management services for the 11-story Children’s Hospital at Fitzsimons. The hospital houses 270 inpatient beds, diagnostic and surgical facilities, outpatient clinics, research space, medical staff and administrative and support spaces. The top level includes a helicopter pad that was designed, in conjunction with the US […]
San Diego County Psychiatric Hospital Building Assessment

Project overview Vanir staff performed a building assessment of the San Diego County Psychiatric Hospital, a 109-bed facility originally constructed in 1958. The assessment was performed to determine compliance with The Joint Commission Life Safety codes and the 2009 and 2018 editions of the Environment of Care. For this effort, our team conducted the following: […]
Kaiser Permanente Roseville Riverside Medical Offices

Project overview Vanir provided project management staff augmentation services for the Kaiser Permanente Roseville Riverside Medical Offices project, which was delivered using the integrated project delivery method. The project team successfully coordinated work hours and the construction schedule with local community and building officials in order to minimize the impact on existing campus operations and […]
Valleywise Community Health Center – North Phoenix

Project overview Vanir served as the integrated program manager for the design and construction of the Valleywise Community Health Center – North Phoenix. This 26,000-square-foot facility is one of Valleywise Health’s network of 12 community health centers spread across Maricopa County. This facility was designed as a prototype for five additional sites. The facility consists […]
UC Davis Betty Irene Moore Hall

Project overview Vanir provided program and construction management services for the Betty Irene Moore School of Nursing project for the UC Davis Health System. The three-story building provides state-of-the-art facilities, with the latest in technology for collaborative learning, including simulation spaces to allow students to imitate clinical care experiences. Certified LEED Gold, this is the […]
University of Colorado Anschutz Medical Campus Anschutz Outpatient and Inpatient Pavilions

Project overview Vanir began providing project and construction management services at the University of Colorado Anschutz Medical Campus (formerly the Fitzsimons Medical Campus) in 1999, completing both the Outpatient and Inpatient Pavilion projects by 2004. Outpatient Pavilion: Our team developed and implemented a project management plan and the policies and procedures for this fast-track, multistory […]
Valleywise Health “Care Reimagined” Program

Project overview Valleywise Health set a goal to transform healthcare in the Phoenix area by expanding its facilities, resources and services. Proposition 480 turned that goal into a reality and laid the foundation for the “Care Reimagined” program. Vanir was selected to provide integrated program management services for the seven-year, $935 million program that aimed […]
Coalinga State Hospital

Project overview In 2002, the state of California hired Vanir to oversee the construction of its new acute care psychiatric hospital, Coalinga State Hospital. At the time, this was the single largest general building construction contract. The facility provides housing and treatment for 1,500 patients — offenders who are committed for health treatment under California’s […]
Northern Valley Indian Health Woodland Clinic

Project overview Vanir provided construction management services to Northern Valley Indian Health to convert an 85,000-square-foot facility (a Burlington Coat Factory built in 1985) into a new medical and behavioral health clinic. The project involved a complete renovation of the exterior of the facility and interior building systems. Approximately 20,000 square feet was utilized and […]