City of Mercer Island Lake Line and Pump Station No. 4

Project overview Vanir provided construction management services for the City of Mercer Island. The existing underwater lake line at the Island was prone to damage and badly deteriorated, and the existing pump stations had reached the end of their service lives. This project used two construction contracts to correct these problems and mitigate environmental impacts […]

Port of Hueneme, Ship-to-Shore Power Retrofit

Project overview Vanir provided project management services for the Port of Hueneme Ship-to-Shore Power Retrofit project. Our services included owner representation, schedule analysis, tenant coordination and monthly project status reporting to the Oxnard Harbor District to facilitate on-time installation and activation of shore power infrastructure. We provided constructability review, bid document review and value engineering […]

City of Lemoore Water Treatment Plants

Project overview Vanir provided project and construction management services for the City of Lemoore’s Water Treatment Plants. Located in the Central Valley, the City of Lemoore has one of the most challenging water quality compositions in California — it contains elevated levels of arsenic, iron, ammonia, total organic carbon and color and has excessive levels […]

City of Port Angeles, Waterfront Transportation Improvements

Project overview The Vanir team provided construction management services for the City of Port Angeles, Waterfront Transportation Improvements, a three-phase project to enhance the City’s waterfront area. The project included the construction of: A new esplanade and seawall along the City’s waterfront Road and stormwater infrastructure improvements Two pocket beaches with rock revetments, including existing […]

Alderwood Water & Wastewater District Picnic Point Wastewater Treatment Facility

Project overview Vanir provided construction management services for the Alderwood Water & Wastewater District (AWWD) Picnic Point Wastewater Treatment Facility project, which involved expanding the facility to its full secondary treatment design capacity of 6 million gallons per day, a 50% increase. The plant remained operational throughout construction, and the project was completed under budget. […]

Photon Science Laboratory Building

Project overview The joint venture (JV) of Vanir and OAC Services, Inc. provided project and construction management services for the Photon Science Laboratory Building located on the Stanford Linear Accelerator Center (SLAC) campus. The facility is a multi-phased tenant improvement project with exterior work consisting of an electrical and liquid nitrogen yard. It includes spaces […]

UC Riverside Student Academic Support Services Building

Project overview Vanir provided construction management services for the new Student Academic Support Services (SASS) building at the University of California, Riverside. The Office of Student Affairs sought to revolutionize the way it provided support services for its students by creating a centralized administrative facility on campus. Previously, students had to travel to four separate […]

University of Washington Fluke Hall Renovation

Project overview The University of Washington (UW) selected Vanir to provide pre-construction and construction management services on the $36 million Fluke Hall renovation. Built in 1988, Fluke Hall is a three-story building that served as the former home of the Washington Technology Center and was not initially designed for microelectronics purposes. This project involved renovating […]

Dillard University Dormitory Restoration

Project overview Vanir served as the construction manager for the historical restoration of three student housing residence halls that were damaged during Hurricane Katrina in 2005. Hartzell Hall (built in 1935), Camphor Hall (1947) and Straight Hall (1936) are three-story structures; through a series of additions in 1962 and 1970, Hartzell and Camphor Halls were […]

Dillard University – Hazard Mitigation Grant Program Drainage Project

Project overview The Vanir team provided professional project and grant management services in support of the planning, design and completion of Dillard University’s Hazard Mitigation Grant Program Drainage Project. The campus experienced historic flooding that damaged buildings as well as disrupted daily classes, prevented entry/exit at Gentilly Boulevard and caused closures of University operations. The […]