City of Port Angeles, Waterfront Transportation Improvements

Project overview The Vanir team provided construction management services for the City of Port Angeles, Waterfront Transportation Improvements, a three-phase project to enhance the City’s waterfront area. The project included the construction of: A new esplanade and seawall along the City’s waterfront Road and stormwater infrastructure improvements Two pocket beaches with rock revetments, including existing […]

Alderwood Water & Wastewater District Picnic Point Wastewater Treatment Facility

Project overview Vanir provided construction management services for the Alderwood Water & Wastewater District (AWWD) Picnic Point Wastewater Treatment Facility project, which involved expanding the facility to its full secondary treatment design capacity of 6 million gallons per day, a 50% increase. The plant remained operational throughout construction, and the project was completed under budget. […]

Photon Science Laboratory Building

Project overview The joint venture (JV) of Vanir and OAC Services, Inc. provided project and construction management services for the Photon Science Laboratory Building located on the Stanford Linear Accelerator Center (SLAC) campus. The facility is a multi-phased tenant improvement project with exterior work consisting of an electrical and liquid nitrogen yard. It includes spaces […]

UC Riverside Student Academic Support Services Building

Project overview Vanir provided construction management services for the new Student Academic Support Services (SASS) building at the University of California, Riverside. The Office of Student Affairs sought to revolutionize the way it provided support services for its students by creating a centralized administrative facility on campus. Previously, students had to travel to four separate […]

University of Washington Fluke Hall Renovation

Project overview The University of Washington (UW) selected Vanir to provide pre-construction and construction management services on the $36 million Fluke Hall renovation. Built in 1988, Fluke Hall is a three-story building that served as the former home of the Washington Technology Center and was not initially designed for microelectronics purposes. This project involved renovating […]

Dillard University Dormitory Restoration

Project overview Vanir served as the construction manager for the historical restoration of three student housing residence halls that were damaged during Hurricane Katrina in 2005. Hartzell Hall (built in 1935), Camphor Hall (1947) and Straight Hall (1936) are three-story structures; through a series of additions in 1962 and 1970, Hartzell and Camphor Halls were […]

Dillard University – Hazard Mitigation Grant Program Drainage Project

Project overview The Vanir team provided professional project and grant management services in support of the planning, design and completion of Dillard University’s Hazard Mitigation Grant Program Drainage Project. The campus experienced historic flooding that damaged buildings as well as disrupted daily classes, prevented entry/exit at Gentilly Boulevard and caused closures of University operations. The […]

University of Notre Dame Center for Arts and Culture

Project overview Vanir provided construction management services for the renovation of the 1920s Hansel Center, which has been restored and renamed the Notre Dame Center for Arts and Culture. Originally constructed as a children’s medical dispensary, the University of Notre Dame recognized the building’s historical significance and the importance of reviving it for the community. […]

Dillard University – FEMA Public Assistance Grant Administration

Project overview Since 2011, Vanir has assisted Dillard University in the administration of its FEMA Public Assistance Grant Program. Our involvement includes managing and closing out over 200 project worksheets (representing over $74 million in recovery costs and over $300 million in total disaster losses), formulating alternative and improved projects, packaging and tracking reimbursement requests […]

Sierra Joint Community College District

Project overview Vanir successfully provided program, project and construction management services to Sierra Joint Community College District on various projects during 1995-2010. The District has campuses in Rocklin, Roseville and Grass Valley. Projects included: A $14.5 million, 88,000-square-foot learning resource center A $2.5 million, 9,000-square-foot childcare development center A $2 million student housing renovation A […]