Project overview

Vanir served as the project manager for the City of Los Banos’ police headquarters building. Our services included design management, bridging documents, construction management, inspection and commissioning. Vanir also conducted a comprehensive architect and contractor outreach/marketing effort to garner as much interest as possible for the design-build project.

Encompassing 32,500 square feet divided between a main building (29,500 square feet) and an adjacent outbuilding (3,000 square feet), the new headquarters includes:

  • An emergency operations center/community room
  • A dispatch center, records room and detective area
  • Property and evidence storage
  • A processing and in-custody holding area
  • A traffic division and code enforcement section
  • A physical training area and vehicle sallyport
  • A communications tower
  • Public and secured parking areas

Without a doubt, the Vanir team’s holistic approach (program, time and cost) has been instrumental in laying the groundwork for a successful project.

– Jason Hedden, Acting Chief of Police, Los Banos Police Department
 
Los Banos, California
City of Los Banos
Architects

Design-Build Architect: Shah Kawasaki Architects

Bridging Architect: The Taylor Group

Contractor

Design-Build Contractor: Swinerton Builders, Inc.

Square Footage
32,500 SF
Construction Cost
$26 Million
Start Date
2022
Completion Date
2023