Tri-City Medical Campus Program

Program overview

Vanir is providing program management services for Tri-City Medical Center (TCMC) in Oceanside, California. Currently, Vanir is preparing criteria documents to onboard a design-build team (DBT). The DBT will prepare the full design construction documents and build the facility in stages over a six-year period. Vanir is also coordinating all of the Early Start (ES) Projects, which includes surface parking, a parking structure, a new campus access road, and emergency repairs to the central plant. We are guiding the entitlements/CEQA process for the ES Projects, which must be completed before the design is finalized and the projects enter the construction phase.

The overall program includes a number of individual projects: construction of a new four-story acute care tower; construction of a new pedestrian bridge to the parking structure; expansion of the central plant; relocating the existing loading dock and existing underground utilities; and relocation of the hospital main entrance. It also includes the ES Projects mentioned above.

The program will be designed and built using a variety of procurement deliveries, including design-bid-build and design-build. All the work is subject to California OSHPD review and approval and the projects will be executed in accordance with the 2016 California Green Building Standards (CALGreen).

Location

Oceanside, California

Client

Tri-City Medical Center

Design Team

TBD

Contractor

TBD

Construction Cost

$245 million

Completion

2025