Vanir is providing program management services for Tri-City Medical Center (TCMC) in Oceanside, California. Currently, Vanir is preparing criteria documents to onboard a design-build team (DBT). The DBT will prepare the full design construction documents and build the facility in stages over a six-year period. Vanir is also coordinating all of the Early Start (ES) Projects, which includes surface parking, a parking structure, a new campus access road, and emergency repairs to the central plant. We are guiding the entitlements/CEQA process for the ES Projects, which must be completed before the design is finalized and the projects enter the construction phase.
The overall program includes a number of individual projects: construction of a new four-story acute care tower; construction of a new pedestrian bridge to the parking structure; expansion of the central plant; relocating the existing loading dock and existing underground utilities; and relocation of the hospital main entrance. It also includes the ES Projects mentioned above.
The program will be designed and built using a variety of procurement deliveries, including design-bid-build and design-build. All the work is subject to California OSHPD review and approval and the projects will be executed in accordance with the 2016 California Green Building Standards (CALGreen).