Higley/Warner/Williams Field Roads
Sewer, Water and Reclaimed Water Extensions

Gilbert, AZ

Meeting the Needs of a Growing Community
Extending the sewer collection system and the water/reclaimed water distribution helped meet the needs for new and future developments of Gilbert. Vanir joined the project team late in the design phase as the project and construction manager, and played an active role throughout the design, bid-award, construction and post-construction phases.

This project involved the design and construction of the following:

  • 5 miles of gravity sewer ranging in size from 15" to 24" at an average depth of 30 feet
  • 2.5 miles of reclaimed waterline ranging in size 16" to 20"
  • 1.5 miles of 16" waterline

Value Engineering Savings
Value engineering savings during design saved $82,105 by simply addressing pipeline alignments, assessing the possibility of repairing irrigation lines, implementing traffic controls, and eliminating overlaps in scopes of work.

 
Client:
Town of Gilbert
Designer:
HEC Engineering
Contractor:
SJL Construction
Construction Cost:
$7 million
Completion:
2005